Citedy
Free migration planner

SEO Migration Checklist

Build a controlled 7/14/30 migration plan with risk scoring, team ownership, KPI baseline checkpoints, and markdown export.

Migration scope input

Risk and blockers

Low risk (18/100)

Migration plan from Semrush to Citedy with a low risk profile. Use controlled overlap and KPI-locked rollout waves.

  • Keyword set size requires stronger baseline governance.

Hard blockers before rollout

  • - No baseline snapshot for clicks, impressions, and indexed URLs.
  • - No rollback criteria defined before wave rollout.
  • - Tool migration scheduled together with template or IA redesign.

Migration checklist progress

0% completed

Days 1-7: Baseline and parallel pilot

Days 8-14: Workflow migration and QA

Days 15-30: Controlled rollout and validation

KPI baseline template (7/14/30)

MetricBaselineDay 7Day 14Day 30
Organic clicks (pilot pages)Set baselineCompare trend deltaConfirm stabilityDecide full rollout
Organic impressions (pilot queries)Set baselineMonitor volatilityTrend direction checkPost-rollout checkpoint
Indexed pages (pilot set)Set baselineRe-crawl coverageDetect index dropsConfirm parity or gain
Crawl depth (money pages)Set baselineNavigation validationInternal link QAArchitecture sign-off

Unlock full export

Preview is open. Enter email to unlock markdown export and full migration notes.